College Walk
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
limited to the area of Push Bikes - The Birmingham Cycling Campaign:
3 issues found for 'resurfacing':
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Chris Lowe // 1 thread
This section of towpath has been reported as having a poor surface. (Not sure how far north of Bournville Station the issue extends)
Using tarmac rather than breedon gravel has been requested, to be harder wearing and retain a good surface longer.
Created by Chris Lowe // 0 threads
Path reported to be poorly surfaced and in need of resurfacing.
One thread found for 'resurfacing':
Push Bikes - The Birmingham Cycling Campaign
A discussion on issue
Poor towpath surface
Chris Lowe
posted
One library item found for 'resurfacing':
No planning applications found for 'resurfacing'.